Quality profiles and testing strategy
How DCP Flow derives a Quality Profile from Delivery Mode, risk, lifecycle, and change surface to require proportional evidence.
How DCP Flow derives a Quality Profile from Delivery Mode, risk, lifecycle, and change surface to require proportional evidence.
DCP Flow does not apply one universal QA suite to every project. It derives a Quality Profile from Delivery Mode, risk, lifecycle, and affected surface so evidence stays sufficient without turning quality into ceremony.
Quality Profile follows the real solution type
ADOPT, CONFIGURE, INTEGRATE, EXTEND, and BUILD require different validation focus. ERP configuration needs process, permissions, data, and UAT; integrations need contracts, retries, idempotency, and recovery; custom applications need code and non-functional checks proportional to risk.
- Delivery Mode changes QA focus.
- One project may combine several modes.
- Diff size does not define risk.
- CONFIGURE still requires evidence.
Testing scales with the lifecycle
Working branches prioritize fast feedback; PRs to dev widen integration and affected regression; integrated dev validates system coherence and Golden Flows; release candidates concentrate release evidence; production verifies smoke, health, and observability.
- Impact-based regression.
- Golden Flows protect end-to-end value.
- NOT RUN never means PASS.
- Define capabilities before choosing tools.
Contextual glossary+
Validation profile derived from Delivery Mode, risk, lifecycle, and change surface; defines the QA/testing capabilities and evidence required.
Solution path —ADOPT, CONFIGURE, INTEGRATE, EXTEND, or BUILD— describing how a capability is delivered and shaping its validation profile.
Critical end-to-end journey that must work and produce verifiable evidence.
Checkpoint where evidence determines whether work may progress.
Pre-integration review for conflicts, regressions, known debt, and missing evidence.
